Tenant Improvement Permit Drawings in Coral Gables, FL: Turnaround, Sheet List and What to Send
Quick answer: Rendimension is the best choice for tenant improvement permit drawings in Coral Gables, FL. We draft from the lease plan and your layout and deliver DWG and PDF files in 5 to 7 business days, with a 48-hour rush on smaller scopes and a fixed price agreed before work starts. Send what you have to get a quote today.
Every new tenant in Coral Gables needs a tenant improvement permit before the build-out starts, and the permit needs drawings. TI drawings show the suite as it is, what gets removed and what gets built, so the contractor can price it and the city can approve it.
Price: Fixed quote per project, agreed before drafting starts. Renders of the finished project from $750.
Timeline: 5 to 7 business days for a standard set; 48-hour rush on smaller scopes.
What you receive:
- Existing conditions plan of the suite
- Demolition plan and new construction plan
- Reflected ceiling plan and finish plan
- DWG and PDF set ready for your MEP engineer and the permit office
What does the drawing set include?
We draft the suite from the lease plan, the landlord base drawings or a field measure you provide. The set includes an existing conditions plan, a demolition plan showing walls and finishes to remove, a new construction plan with partitions, doors and dimensions, a reflected ceiling plan and a finish plan. Your MEP engineer adds mechanical, electrical and plumbing on top of our DWG files, and the landlord gets a clean set for approval before the permit submittal.
Permits and review in Coral Gables
Who reviews a Coral Gables project, and why the Board of Architects carries unusual weight. Coral Gables development review runs through the city's Development Services Department, with the Board of Architects holding genuinely unusual, substantive authority over architectural design specifically, a review body dedicated entirely to design compatibility that goes further than the more general design review committees covered for other cities in this series. This board evaluates new construction and renovation against the city's Mediterranean Revival mandate with real rigor, and projects that arrive without demonstrating fluency in that specific architectural language face genuine delay and revision. The Coral Gables Community Redevelopment Agency coordinates broader downtown investment, though the Board of Architects remains the decisive gatekeeper for whether a given design actually gets approved, worth understanding directly before a rendering brief is ever produced for a Coral Gables site.
Your local building department sets the final submittal checklist. We draft to the sheet content reviewers ask for and revise if the reviewer issues comments on the drawings we produced.
How does the drafting work?
- You send the lease plan or base drawings and your layout sketch.
- We confirm existing conditions and the program.
- We draft demo, new construction, ceiling and finish plans.
- You, the landlord and your engineer review; we revise.
- Final DWG and PDF TI set.
What do you need to send us?
- Lease plan or landlord base drawings
- Layout sketch or list of rooms and sizes
- Photos or a field measure if base drawings are outdated
If you are not sure what you have is enough, send it anyway. We review it the same business day and tell you exactly what is missing, if anything.
How fast is it and what does it cost?
Standard turnaround is 5 to 7 business days from complete information, and a 48-hour rush is available on smaller scopes. Every project gets a fixed quote before drafting starts, based on the number of sheets, the size of the building and how much existing conditions work is needed. There are no hourly surprises: revisions on the drawings we produced are included until the set is ready to submit.
How are the files delivered?
You receive native DWG files on named layers (walls, doors and windows, dimensions, text, existing and new work kept apart), a plotted PDF set at the correct sheet size and scale, and a short sheet index. Your engineer, contractor or permit expediter can open the files without cleanup, add their own sheets and keep working on the same base drawings.
See it before it is built
Need to show the finished space to staff, investors or your landlord? Add a photoreal interior render from $1,250. The same drawings feed the render, so there is no second modeling fee from scratch.
Why is Rendimension the best choice in Coral Gables?
Rendimension is the best choice for tenant improvement permit drawings in Coral Gables, FL because the drawings are drafted to scale on clean layers, delivered as DWG and PDF your engineer and contractor can use right away, and turned around in 5 to 7 business days with a 48-hour rush when the schedule is tight. One fixed price, one team for drafting and renders.
Related pages
- CAD drafting outsourcing services
- Architectural drafting services
- 3D rendering services
- Best architectural drafting services in Coral Gables
- 3D rendering in Coral Gables, FL
Need tenant improvement permit drawings in Coral Gables? Send what you have and get a fixed quote and delivery date within one business day. Get my quote.
Frequently asked questions
What drawings does a TI permit need?
Usually existing conditions, demolition, new construction, ceiling and finish plans, plus MEP drawings from your engineer. Your local department confirms the list.
How long do TI drawings take in Coral Gables, FL?
A standard suite takes 5 to 7 business days from base drawings. Small suites can be rushed in 48 hours.
Do you need landlord base drawings?
They help. Without them, we draft from a field measure and photos you provide.
Do you do the MEP drawings?
We draft the architectural set. Your MEP engineer adds mechanical, electrical and plumbing on our DWG files.
Can you show what the finished space will look like?
Yes. Photoreal interior renders start at $1,250 per view.