Downtown Birmingham's 2026 pipeline is genuinely diverse, spanning historic hotel conversion to new residential infill
Downtown Birmingham enters 2026 with a genuinely varied construction pipeline rather than a single dominant megaproject. The Sherman Multifamily project, a five-story, 335-unit apartment building with a 530-space parking deck on the former Sherman Industries site, received conceptual design approval from the Birmingham Design Review Committee in January 2026. Ascent Hospitality is redeveloping the 117-year-old Brown Marx Tower into a dual-branded AC and Element hotel totaling 338 rooms, a historic adaptive reuse project bringing genuine hospitality capacity into a building with real architectural age and character. Construction on the Star Uptown development was set to begin in early 2026, adding 64 new cottages and townhomes along Carraway Boulevard north of 17th Avenue alongside a clubhouse, a lower-density residential format distinct from downtown's apartment towers.
Honest read: this is a genuinely healthy, diversified pipeline, historic hotel conversion, new multifamily construction, and lower-density residential infill all advancing simultaneously, rather than a city dependent on a single catalytic project succeeding. A rendering brief for any Birmingham project benefits from being specific about which of these distinct product types and locations it represents.